QBE Insurance Group Data Center

Sun Prairie, WI
Mission Critical

This project was completed while maintaining concurrency of operations, and involved a complete renovation of the two original data rooms. The two were made into one larger data room, which required removal of the separation wall, complete removal and replacement of the ceiling system, fire suppression system, mechanical cooling system, and new electrical power system with standby generation to provide a N+1 redundant infrastructure. The cooling strategy implemented was hot aisle/cold aisle containment, which Findorff installed.

Project highlights:

  • 12,700 square feet
  • Replacement of electrical and mechanical infrastructure
  • Concurrence of operations during construction
  • Level 5 commissioning
Services Provided